{{-- data table --}}
Super Admin
E-mail
abcd123@gmail.com
My Profile
@csrf
Logout
Username
My Profile
@csrf
Logout
Dashboard
Dashboard
Division User Master
Directorate of Telemetry(TM)
EOT Division(EOTS)
Radar Systems Group(RADAR)
Central Data Processing Division(CDP)
Communication Directorate(COMN)
CCTV Group(CCTV)
Central Timing Division(CTD)
Ground Safety & Launch Complex Directorate(GS&LC)
Flight Safety & Mission Analysis(FS&MA)
Mission Co-ordination Division(MCD)
Integrated Material Management Division(IMMD)
Power Systems Division(PSD)
Mechanical Transport Group(MT)
Workshop Group(WKSP)
Meteorology Division(MET)
QA&TE Division(QA&TE)
Admin Group(ADMIN)
Telecommand Group(TC)
Phote Processing & Hight Speed video Group(PP&HSV)
Target Systems Group(TSG)
Works Project Group(WPG)
Fire &Industrial Safety(FI&ES)
Health Care Center(HCC)
Security(SEC)
Human Resource Development Group(HRD)
Planning Group(PL)
Document Master
Quality Manual(QM)
Process Details(PD)
Work Instruction(WI)
Quality Plan-01(QP-01)
Quality Plan-02(QP-02)
Quality System Procedure-01(QSP-01)
Quality System Procedure-02(QSP-02)
Quality System Procedure-03(QSP-03)
Quality System Procedure-04(QSP-04)
Quality System Procedure-05(QSP-05)
Quality System Procedure-06(QSP-06)
Quality System Procedure-07(QSP-07)
Quality System Procedure-08(QSP-08)
Quality System Procedure-09(QSP-09)
Quality System Procedure-10(QSP-10)
Forms Master
Admin
1.Customer
Feedback:
2.Record On
Non-Conformity:
3.Despatch Record:
4.Receipt Record:
5.Checklist For Sanction
Of LTC:
6.Checklist For
Consideration Of Resignation:
7.Certificate For Processing
Of Resignation:
8.Checklist For Preparation
Of Pension Papers:
9.Checklist For Voluntary
Retirement:
10.Checklist For Processing
Application For Outside:
Communication
1.Configuration Plan Of
Communication Date:
2.Check List For Satcom
Link:
3.Check List For RF Link:
4.Check List For Optical
Fiber Link:
5.Check List For Gigabit
Ethernet Network:
6.Check List For Installation
Of IP Based C-8 Systems:
7.Check List For Provision
Of EPABX:
8.Check List For Video
Streaming System:
9.Check List For Provision
Of Communication Facilities:
CDP
1.Check List For Range
Computer Readiness:
2.Check List For Norminal
Trajectory & software modules:
3.Log Book On Link Check
Data:
MT
1.Customer Feed Back:
2.Duty Slip For MT Drivers:
3.Requisition For
Transport:
HRD
1.HRD Profile:
2.Identifying Training Needs
Of The Directorate/Division/Group/Section:
EOTS
1.Configuration Plan OF
EOTS:
2.Check List ON Installation
& Preparation Of Site Stations Of EOTS:
3.Link Check Data
Record During Mission:
CCTV
1.Configuration Plan OF
CCTV:
2.Check List On Camera
Positioning:
3.Check List On Recorder
And Sub-Systems:
4.Check List On Video
Coverage Performance:
5.Check List n Editing:
6.Record On Handing Over
Of Mission Video:
PSD
1.Deployment &
Configuration Plan:
2.Check List On Power
System Key O/P Parameters:
3.Ensuring Of Stabilised
Power Supply:
MET
1.Check List For Weather
Forecasting:
2.Check List For Weather
Warning:
Timing
1.Check List For
Preparation Of Real Time &Count Down Time:
2.Record On Ensuring
Proper ATD &CDT At Vaarious Sites:
3.Log Book Format On
Post Mission Data:
FS&MA
1.Check List ON Failure
Mode Trajectory:
2.Check List On Issue Of
Notification :
3.Check List On Updatting
Flight Safety Display S/W:
Workshop
1.Work Order:
2.Job Card:
Telemetry
1.Check List On Station
Readiness & Preparation Of Telemetry Station:
Telecommand
1.Configuration Plan Of
Telecommand System:
2.Check List On
Preparation & Health Check Of Telecommand System:
3.Log Book On Helicopter
Sortie Participation:
4.Log Book On PHASE-IV
Check (On-Board Receiver Check):
5.Log Book On RIC
(On-Board Receiver Check):
6.Telecommand Local
Check With FSO:
GS&LC
1.Check List For Launch
Complex,Assy Hangers & Explosive Storage Building:
2.Check List On Readiness
Of Emergency Support Facility:
3.Check List On Readiness
Of Material Handing Support:
4.Log Book On Storage
Of Left Out Rocket:
5.Check List On Recovery
Operation:
QA&TE
1.Audit Observation
Recording:
2.Non-Conformance
Report:
4.Document Change
Request Form:
5.Customer Feedback
Report On Calibration:
6.Document Change
Request Form For Admin:
7.Format For Control Of
External Origin Documents:
8.Format For Control Of
Outsourcing Processes:
PP&HSV
1.Configuration Plan Of
& HSV:
2.Check List On Camera
Readiness & Processing:
3.Record On Yanding Over
Of Mission Data For Still Photography And High Speed Video:
Target System
1.Target Requirement
Matrix:
Works Project
1.Check List On Provision
Of Survey Facility:
Minutes
JCC Minutes
RPMA Minutes
Audit Management
Circular QA&TE DIVISION
Observation Header
Non_conformance_Header
Device & Calibration Master
Calibration Module
Observation QA&TE Division
T & E Committee
T&E Module
Test & Evaluation Check-
List For EOTS
Test & Evaluation Check-
List For TELEMETRY
Test & Evaluation Check-
List For RADAR(DSIS)
Test & Evaluation Check-
List For RADAR (PCMC)
Test & Evaluation Check-
List For RADAR (ICBR)
Test & Evaluation Check-
List For RADAR (KAMA-N)